Sangar Housing Project provide sustained development for a healthy and vibrant place with a strong infra structure base supporting diversified housing opportunities and a wide range of tourism as well recreation facilities for all. Sangar Housing Project build a state of art housing and tourism facility supporting the development of the city of Gwadar.
To build a state of art housing and tourism facility supporting the development of the city of Gwadar. To provide sustained development for a healthy and vibrant place with a strong infra structure base supporting diversified housing opportunities and a wide range of tourism as well recreation facilities for all.
Project: Sangar Housing Project – Gwadar
Sponsored by: Government of Balochistan
Project Director: Deputy Commissioner – Gwadar
Project Consultant: Consultants Group
Financial Status: Self Financed
It is a completely self-financed scheme.
Engineering design has been carried out after full soil investigation study. Soil bearing capacity on Koh-i-Batil is double of what is found in the coastal belt and has been found suitable for sildigra 100 mg
Design of utility services is based on most modern engineering codes and efficient utilities systems.
Development started in 1992 and continued till date covering different phases & activities.
The Consultants Group (CG) has been commissioned to carry out documentation of plots allotments and transfers with a fool-proof and fully computerized system.
The allotment is ordered by the Project Director and papers are prepared by CG in accordance with the documents forwarded by the PD.
The transfers are the responsibility of the PD followed by actual documentation executed by CG.
The signing authority in all cases is the PD.
The record of each and every allottee and transferee along with plot detail is available on Computer with hard copies in files kept at the Project Office in Gwadar.
The detail of any plot can verified from Project as well as Consultant’s Office.
Special Facility has been given to the owners for Transfer at Karachi.
The work on the street lighting has been started whereas major materials like cables, transformers, switchgear have arrived on the site
The QESCO has already agreed to provide electricity to project office and some street lighting from the existing 11kv line.
The site for Grid Station has been allotted in Sangar Phase-II.
Grid station for Sangar Housing Project will be constructed by WAPDA through Federal Financing; however, the work on site has not started as yet. The completion of the Grid Station will take at least around 18 months.